P70, P80, P90 Forecasts
P70, P80 and P90 are demand forecasts at given confidence levels — the quantity you expect to sell in at least 70%, 80% or 90% of scenarios.
What the numbers mean
A P50 forecast is the median: half the time you sell more, half the time less. A P90 forecast is the quantity you expect to be able to sell in 90% of scenarios — a higher number than P50 because it covers most upside. A P10 covers most downside. Together they describe a distribution rather than a single guess, which is what makes them useful for planning under uncertainty.
These levels originated in demand planning for consumer goods and are used in vendor replenishment agreements and internal inventory planning.
How they pair with decisions
- Purchase commitments — base on something close to P50, with flexibility for upside.
- Safety stock — sized against the downside (P10–P30 range).
- Capacity reservation — planned at P70–P80 so you are not paying for a scenario that rarely occurs.
- Promotional stock — planned at P90 where a stock-out costs more than carrying the extra units.
- Financial planning — P50 for the base case, P10 and P90 for the range.
Building the distribution
- Start with a base forecast from recent velocity, seasonality, and known events.
- Estimate variability from historical forecast error, not from intuition.
- Apply the confidence factor — wider for new products, narrow for established staples.
- Publish all three levels, not just one, so decisions can pick the right level.
- Review against outcomes — the forecast is only good if the spread was realistic.
The mistake that matters
Choosing the confidence level by temperament rather than by decision. Optimists plan inventory at P90 and carry excess; pessimists plan at P10 and stock out. Neither is a forecast error — both are decision errors about which level a decision should use. Purchase orders, safety stock, and promotional buys all want different levels, and mixing them produces either excess or shortage systematically.
For Amazon sellers specifically
Amazon's own demand planning tools and vendor systems increasingly speak in these terms, and joint business plans often reference a committed level. Know which level you are committing to before signing: a commitment at P90 with penalty terms is a very different obligation from a P50 plan. That single distinction has cost vendors a great deal of money in agreements they read quickly.
How variability sets the spread
A staple product with two years of stable sales might have a P10-to-P90 range of plus or minus 15%. A seasonal novelty might have a range of minus 60% to plus 200%. The confidence levels do not create the spread — they express it. If your three numbers are nearly identical, you have not estimated variability; you have written the same guess three times.
Where the levels appear in vendor work
Amazon's vendor planning conversations often reference committed quantities without labelling them by confidence level. Ask the question explicitly: is this a P50 plan or a commitment? A plan is guidance; a commitment may carry fill-rate obligations and penalties. Vendors who discover the difference after signing find themselves liable for a number they treated as a forecast.
Keeping a forecast accuracy record
Track each published forecast against actual sales six weeks later and record the error. After three or four cycles you know whether your P50 is biased high or low, and whether your spread is too narrow. That record is the only way the levels improve — without it, every forecast cycle restarts from the same optimistic assumption and produces the same inventory mistake.
P70, P80, P90 FAQ
Which is the highest number?
P90 — higher coverage requires a larger quantity.
Do I need statistical software?
No — historical error ranges are enough to produce useful levels.
Which should I use for reordering?
P50 for the base order, with safety stock covering the downside.
Are these the same as service levels?
Related concepts — service level is the probability of meeting demand from stock.
How often should they be recalculated?
Monthly, and after any material change in velocity or lead time.