Harpy Glossary

Min-Max Inventory System

Amazon & D2C glossary · Harpy Media

A min-max system sets a reorder point (min) and a target level (max): when stock falls to the minimum, you order enough to reach the maximum.

How it works

The minimum is the reorder point — stock at which a replenishment order must be placed so that goods arrive before the stock runs out. The maximum is the level you replenish to, sized to cover demand over the order cycle plus safety stock. The gap between them is the order quantity. It is a simple, robust system that works without sophisticated forecasting.

For Amazon sellers the calculation must account for FBA receiving lag, in-transit inventory, and the low-inventory fee threshold.

Setting the numbers

  1. Minimum = demand during lead time + safety stock — where lead time includes production, freight, and receiving.
  2. Safety stock covers variability — in demand and in supply; more for volatile or long-lead items.
  3. Maximum = minimum + order quantity, where order quantity reflects MOQ, container fill, or freight economics.
  4. Recalculate quarterly — velocity changes, and so do lead times.
  5. Review exceptions weekly — anomalies matter more than routine replenishment.

Applying it to FBA

FBA adds two complications. First, inventory is split between available, inbound, and receiving — all three must be in the model or you will reorder stock that is already on its way. Second, the low-inventory fee penalises persistently thin cover, so the minimum must be set above the fee threshold, not just above zero.

⚠️ Watch out. A min-max system that ignores inbound inventory produces over-ordering — the classic pattern behind excess stock and long-term storage fees.

When min-max is not enough

For products with strong seasonality, promotions, or high demand volatility, a fixed min-max under- or over-stocks predictably. Use it as a baseline and layer a demand forecast for the top SKUs, or shift to a periodic review system that reassesses the target each cycle. Many sellers run min-max on the long tail and forecast-driven planning on the top twenty products by revenue — a sensible division of effort.

A worked example

Weekly sales of 200 units, lead time of eight weeks, and a 25% safety buffer: minimum = 200 × 8 × 1.25 = 2,000 units. If the maximum is set at 3,500, the order quantity is 1,500 — roughly seven and a half weeks of cover, which sits comfortably above low-inventory thresholds and below aged-stock risk. Recalculate when velocity moves by more than 20% or the lead time changes.

Where the system fails quietly

Two silent failures: the minimum is set from a supplier's quoted lead time rather than your actual observed lead time, and the maximum is set from an order quantity that no longer matches the freight configuration. Both produce a system that looks correct and is systematically wrong, which is worse than no system because it is trusted. Compare the model against actual arrivals quarterly and adjust to reality.

Setting safety stock sensibly

Safety stock exists for variability, not for pessimism. Size it from observed variability in demand and lead time: a product with stable sales and a reliable supplier needs weeks, not months; a product with erratic demand or a factory that slips needs considerably more. Review the assumption after every stock-out and every excess write-down — those are the two events that tell you the buffer was wrong in one direction or the other.

Reporting that keeps it honest

Track three numbers monthly per SKU: stock-outs, excess units written down or aged, and average days of cover. A system working well shows few of the first two and a cover figure in the planned band. Divergence in either direction points to the same cause — the min or the max is set from assumptions that no longer match the supplier and demand reality.

Min-Max Inventory System FAQ

What is the min in min-max?

The reorder point — when stock reaches it, place an order.

What is the max?

The target level to replenish to, sized to the order cycle.

Does it work for FBA?

Yes, with inbound and receiving lag included in lead time.

How often do the numbers change?

Recalculate quarterly and after any supplier or freight change.

What if I cannot forecast demand?

Set the max generously and use review cadence to correct — better than stock-outs.

Want these numbers watched for you, every week?

Book Free Consultation

New guides, straight to your inbox.

Practical D2C playbooks as we publish them. No fluff, no spam — unsubscribe anytime.